THE THROUGH FLOOR VERTICAL LIFT RANGE

1. Wessex Area Sales Manager assesses the feasibility of installing the chosen product.

2. A formal quotation is produced and sent to customer for evaluation.

3. Should the quotation be acceptable, the customer sends a written order to the Wessex Sales office (stating the quotation number). From this point the lift would typically be available for installation between 6-8 weeks. This lead in period may vary - please check with our office if you require clarity.

4. A surveyor will visit the property to take exact dimensions, thus ensuring a trouble free installation.

5. The installation department will then be in contact (usually to the user of the equipment) to arrange a suitable date and time for the installation.

6. On the agreed date Wessex builders will arrive and over the next 2 or 3 days will form the aperture (cutting the hole through the ceiling). The Lift Installation will then follow. Dependent upon the area within which you live, there may be a small delay between the building work and lift installation (typically 1-3 days).

7. The lift is now installed in your property and will be commissioned before being formally demonstrated to the user. A comprehensive user guide will be left for your reference and all details relating to service and breakdown cover can be found within.

T: +44 (0)1794 830303 F: +44 (0)1794 512621 E: info@wessexlifts.co.uk