THE THROUGH FLOOR VERTICAL LIFT RANGE 1. Wessex Area Sales Manager assesses the feasibility of installing the chosen product. 2. A formal quotation is produced and sent to customer for evaluation. 3. Should the quotation be acceptable, the customer sends a written order to the Wessex Sales office (stating the quotation number). From this point the lift would typically be available for installation between 6-8 weeks. This lead in period may vary - please check with our office if you require clarity. 4. A surveyor will visit the property to take exact dimensions, thus ensuring a trouble free installation. 5. The installation department will then be in contact (usually to the user of the equipment) to arrange a suitable date and time for the installation. 6. On the agreed date Wessex builders will arrive and over the next 2 or 3 days will form the aperture (cutting the hole through the ceiling). The Lift Installation will then follow. Dependent upon the area within which you live, there may be a small delay between the building work and lift installation (typically 1-3 days). 7. The lift is now installed in your property and will be commissioned before being formally demonstrated to the user. A comprehensive user guide will be left for your reference and all details relating to service and breakdown cover can be found within. |